Trenching

Firstgas Pragma still 01

Trenching or Full Construction options

We can use an open trench to install a duct through which the gas connection can be inserted.  Firstgas can share this trench with other services so long as it meets our dig your own trench specifications.

Alternatively, depending on site conditions, we can complete a full construction connection.  We will always aim to minimise any disruption to the site and in most instances we will be able to thrust or drill the connection between the existing pipeline and meter position.  If either of these methods are not suitable for the site, we would open a trench and install our pipe. 

We will provide you with a quotation for installing a gas connection and once you have signed and returned the quotation to Firstgas - even if there is no charge for the connection - we can schedule the work in and confirm a completion date with you.