Help your customers upgrade to the Rinnai EF26 for less this winter

Gas Heated Shower

Save up to $1,000

For a limited time, Firstgas is offering homeowners up to $1,000 towards the installation cost of high efficiency Rinnai EF26 gas water heating systems.

For more information about the promotion, please contact our team at Connections@firstgas.co.nz or call 0800 347 784

S86440 260317 Firstgas Website Tiles 880x670 V1 FA 01

Why choose the Rinnai EF26

  • Uses 11% less energy compared to a standard Rinnai INFINITY A26
  • High-efficiency condensing technology
  • Continuous flow hot water – never runs out
  • Premium Rinnai engineering
  • Great upgrade option for older gas hot water systems
showerwbwi

How the promotion works

  1. Visit firstgas.co.nz/get-connected/check-availability to check your customer’s address is valid

  2. Check with connections@firstgas.co.nz that your customer has received approval from Firstgas Connections that the promotion is still available.

  3. Assess the customer’s existing appliance to make sure it’s over 10 years old OR end of life.

  4. Install the Rinnai EF26 for an eligible customer

  5. Invoice the customer for your agreed cost minus $1,000

  6. Invoice Rinnai directly for the $1,000 installation subsidy provided by Firstgas

S86440 260317 Firstgas Website Tiles 880x670 V1 FA 01

Check if your customers address is valid

Terms & conditions for provision of Firstgas impressed current cathodic protection and system interruption. 

  1. Access to any Firstgas Cathodic Protection (CP) rectifiers is restricted to Firstgas authorised personnel only.

  2. Installing interruption or modification of operation of any nominated Firstgas transformer rectifier(s) shall be performed by Firstgas CP Technicians/Technologists only.

  3. Isolation, adjustment, or re-energisation of any Firstgas transformer rectifier shall be carried out by Firstgas authorised personnel only.

  4. Acting on recommendations for changes to rectifier settings will be at the discretion of the Firstgas CP Technicians/Technologists.

  5. Any CP faults or shorts likely to impact the Firstgas CP system must be reported to Firstgas within 48 hours of identification.

  6. Any work that may adversely affect the Impressed Current Cathodic Protection (ICCP) system requires prior formal approval1 from Firstgas.
    Works include, but are not limited to:
    i.    replacement, removal or installation of any flange insulation kits (FIKs) connected to the Firstgas ICCP system,
    ii.    welding (of any kind) on pipeline(s) that are cathodically protected by Firstgas’ ICCP system,
    iii.    installation of polarisation cells replacement (PCR) onto the system,
    iv.    connection of any earthing system(s) to the cathodic protected side of the pipe,
    v.    fitting of surge protection devices, 
    vi.    reconfiguration of station piping, or
    vii.    any other changes that could alter CP current requirements.

  7. Making or breaking of CP cross-bonds requires formal approval1, whether the change is intended to be temporary or permanent.

  8. Bonding additional pipework/pipelines into the Firstgas ICCP systems is not permitted without formal approval1.

  9. To maintain pipeline polarisation, interruption of the ICCP system will be for a maximum of eight [8] hours per day for four [4] days (1 cycle) every two [2] weeks.  And early completion of work must be promptly notified to Firstgas CP Technicians/Technologists.

  10. A minimum of 10 business days’ notice is required for surveys involving rectifier interruptions, including details of timing, duration, and interruption cycles. Where this notice cannot be met (e.g., DCVG surveys, incident response), scheduling will be at Firstgas’ discretion.

  11. Firstgas reserves the right to disconnect other parties from the Firstgas ICCPs if it is found they compromise the system integrity, including failure to comply with these conditions.

    For formal approval requests, please email CP@firstgas.co.nz.